| Date |
Topic |
Description |
| 2008 Aug. |
Window Trim |
Replacing rotten
window trim. |
| 2008 Jul. |
Outlets / Switches |
Replacing painted
and non-grounded outlets. |
| 2008 Jul. |
Hood Vent |
An improved exhaust
vent for our kitchen hood. |
| 2008 Jul. |
Liquor Shelf |
Booze moves from a
cart to a high shelf. |
| 2008 Jul. |
Bathroom Shelf |
Yet another IKEA
product for our home. |
| 2008 June |
Shed |
Shitty shed is
shelved. |
| 2008 June |
Crawl Space Storage |
Crawl space under
the house is prepped for future storage. |
| 2008 Mar. |
South Yard |
Weeding, digging and
mulching adjacent to the kitchen. |
| 2008 Mar. |
Soffit Vents |
Soffit vents are
installed about 1 year after the ridge vent. |
| 2008 Mar. |
Windows |
Five new replacement
windows. |
| 2008 Feb. |
Hole in Ceiling |
Unexpected
remodeling. |
| 2008 Feb. |
Super Will |
Electricity and fans
in the attic. |
| 2008 Feb. |
Franken-stools |
29-inch stools
become 5 inches taller. |
| 2008 Jan. |
Mudroom |
We add 50 square
feet to our house. |
| 2008 Jan. |
Willow Haircut |
Annual trimming of
the Dr. Suess tree. |
| 2007 Dec. |
Stumps |
I cut down trees,
wear high heels... |
| 2007 Nov. |
Attic Access |
New attic access to
provide storage for PJ. |
| 2007 Nov. |
Front Yard |
Martin's Annex |
| 2007 Jul. |
French Drain |
Diverting water
around the front bedroom. |
| 2007 Jul. |
Attic Framing |
Reframing in the
attic for a new kitchen vent. |
| 2007 May. |
Ridge Vent |
Cutting a new roof
to vent the attic. |
| 2007 Apr. |
Kitchen |
Two-day kitchen
remodel thanks to SuperWill. |
| 2007 Mar. |
Cleaning the Attic |
I don't even want to
talk about it. |
| 2007 Feb. |
Bathroom |
We replace our
toilet and faucet. |
| 2007 Feb. |
Shear Walls |
I brace our house
for the big one. |
| 2006 Oct. |
Tostada |
How to make a
Tostada. |
| 2003
Oct. |
Cable Stayed
Bridge |
Design and construction of a cable stayed
bridge in one day. |
| 2002
June |
Observation
Deck |
Trimming the trees provided a foundation for
my latest endeavor. |
| 2001 June |
Water Tank |
"Better not let that get away from
us..." |
| 1989 June |
Skateboard Ramp |
14 year old kids
built a 12-foot tall monster. |
| 1988 July |
Front Yard (Felton) |
It started with a deck expansion when I was 13
and has never stopped. |